Namma Metro · updated 20 November 2026

Bangalore Metro Map 2026

88 stations open on the Purple, Green, Yellow and Pink lines · Blue Line under construction
PDF Image

Drag to pan · Scroll to zoom

Silk BoardIbbaluruBellandurKadubeesanahalliMarathahalliISRODoddanekundiKR PuramKasturi NagarHoramavuKalyan NagarHBR LayoutNagawaraKempapuraKodigehalliJakkur CrossYelahankaBagalur CrossDoddajalaAirport CityKIAL TerminalsKalena AgraharaHulimavuBilekahalli-IIMBJP Nagar 4th PhaseJayadevaSG PalyaLakkasandraLangford TownCantonmentPottery TownTannery RoadVenkateshpuraDelta Electronics BommasandraBiocon HebbagodiHuskur RoadInfosys Foundation Konappana AgraharaElectronic CityBeratena AgraharaHosa RoadSingasandraKudlu GateHongasandraRV RoadMadavaraManjunath NagarDasarahalliPeenya IndustryGoraguntepalyaSandal Soap FactoryMahalakshmiRajajinagaraSampige RoadMajesticChikkapetteKR MarketNational CollegeSouthend CircleJayanagarBanashankariYelachenahalliKonanakunte CrossVajarahalliTalaghattapuraSilk InstituteWhitefieldHopefarm ChannasandraNallurhalliSeetharamapalyaHoodiIndiranagarTrinityCubbon ParkHosahalliAttiguppeDeepanjali NagarMysuru RoadRajarajeshwari NagarPattanagereKengeri Bus TerminalKengeriChallaghatta

Download the Bangalore metro map (PDF and image)

Bengaluru’s Namma Metro has 4 lines carrying passengers today: Purple, Green, Yellow and Pink (first section), with 88 stations open. The Blue Line to the airport is under construction. Use the interactive map above to search any place and find its nearest station, or download the printable map below.

Updated 20 November 2026. Dashed lines are under construction; lines are drawn station to station. Map data © OpenStreetMap contributors.

Namma Metro lines at a glance

LineRouteStationsStatus
Purple LineWhitefield – Challaghatta37Open
Green LineMadavara – Silk Institute32Open
Yellow LineBommasandra – Rashtreeya Vidyalaya Road16Open
Pink LineKalena Agrahara – Nagawara6 of 18 openFirst section open
Blue LineCentral Silk Board – KIAL Terminals29Under construction

Map of each metro line

Each line on its own, with every station named and the other lines faded. Tap a map for that line's stations and timings.

Interchange stations

Coming later: MG Road (Purple ⇄ Pink), Central Silk Board (Yellow ⇄ Blue), KR Puram (Purple ⇄ Blue) and Nagawara (Pink ⇄ Blue). How to change lines

Metro timings in short

From Tuesday to Saturday the first trains leave the end stations at 5:00 AM on the Purple and Green lines and 6:00 AM on the Yellow and Pink lines. On Sundays service starts at 7:00 AM, and on Mondays earlier. The last trains leave between about 10:42 PM and 11:55 PM.

First and last train at every station

All Namma Metro stations, line by line

Pink Line stations6 of 18 open

  1. Kalena Agrahara
  2. Hulimavu
  3. Bilekahalli-IIMB
  4. NS Palya-JP Nagar 4th Phase
  5. Jayadeva Hospital · change for Yellow
  6. SG Palya (formerly Tavarekere)
  7. Dairy Circle · under construction
  8. Lakkasandra · under construction
  9. Langford Town · under construction
  10. National Military School · under construction
  11. Mahatma Gandhi Road (MG Road) · change for Purple · under construction
  12. Shivajinagar · under construction
  13. Cantonment · under construction
  14. Pottery Town · under construction
  15. Tannery Road · under construction
  16. Venkateshpura · under construction
  17. Kadugondanahalli · under construction
  18. Nagawara · change for Blue (later) · under construction

Upcoming metro lines

Where each new line stands today, what happens next, and when trains could run. Targets are reported, not official, unless BMRCL has announced a date.

  • Blue Line (airport line)

    Central Silk Board – KR Puram – Hebbal – Airport

    Trial runs

    58.19 km · 29 stations · Silk Board–KR Puram section 19.75 km, 13 stations

    1. Awaiting approval
    2. Approved
    3. Construction
    4. Trials
    5. Open
    Where it stands
    Test trains run from Byappanahalli depot to Doddanekundi on the Outer Ring Road (since 10 Nov 2026). Civil work was about 72% done in August; signalling is the main job left.
    What happens next
    Finish the last stretch of track and the signalling, then the safety inspection by the Commissioner of Metro Rail Safety (not yet scheduled).
    When trains could run
    In three parts (below). The whole line, Silk Board to the airport, around March 2028. BMRCL targets, not official dates.
    Opens in parts
    1. 1Central Silk Board – KR Puram (Outer Ring Road)Phase 2A · 19.75 km · 13 stationsAround May 2027Trial runs
    2. 2Hebbal – Yelahanka – AirportPhase 2B, part 1 · 8 stations, Hebbal to KIAL TerminalsAround Sep 2027Under construction
    3. 3KR Puram – Nagawara – HebbalPhase 2B, part 2 · 8 stations, Kasturi Nagar to Kempapura; joins the two partsDec 2027 – Mar 2028Under construction
    Areas it serves
    HSR Layout, Agara, Bellandur, Marathahalli, Doddanekundi, KR Puram, Hebbal, Yelahanka, the airport
    Change to other lines at
    Silk Board (Yellow), KR Puram (Purple), Nagawara (Pink, later), Hebbal (Orange and Red, later)

    Latest (10 Nov 2026): A test train reached Doddanekundi on the Outer Ring Road. Source

  • Pink Line underground

    Dairy Circle – MG Road – Shivajinagar – Nagawara

    Under construction

    13.76 km · 12 underground stations

    1. Awaiting approval
    2. Approved
    3. Construction
    4. Trials
    5. Open
    Where it stands
    The tunnels are built; platform screen doors and signalling are being installed and linked. The elevated first section, Kalena Agrahara–SG Palya, opened on 14 Nov 2026.
    What happens next
    Trial runs in the tunnels, then the safety inspection. No start of underground trials has been reported yet.
    When trains could run
    Around May 2027 (BMRCL target, not an official date).
    Areas it serves
    Lakkasandra, Langford Town, MG Road, Shivajinagar, Cantonment, Tannery Road, Nagawara
    Change to other lines at
    MG Road (Purple), Nagawara (Blue, later), Cantonment railway station

    Latest (19 Oct 2026): BMRCL aimed to start running trains as far as Shivajinagar by November 2026; the opening target is May 2027. Source

  • Orange Line (Phase 3)

    JP Nagar 4th Phase – Mysuru Road – Peenya – Hebbal – Kempapura

    Approved

    32.15 km · 21–22 elevated stations · parts double-decker with a road flyover

    1. Awaiting approval
    2. Approved
    3. Construction
    4. Trials
    5. Open
    Where it stands
    Approved by the Union Cabinet in Aug 2024 (with the Grey Line, ₹15,611 crore). A ₹6,100 crore JICA loan was signed in Mar 2026. Civil tenders were invited in Jan 2026, but no contract is awarded yet: the double-decker design still needs the Centre’s clearance.
    What happens next
    The state aims to finish tendering and start work within six months (Minister Krishna Byre Gowda, Nov 2026). That is when work starts, not when trains run.
    When trains could run
    Not announced. The 2024 approval said 2029; newer reports point to 2031–32.
    Areas it serves
    Western Outer Ring Road: JP Nagar, Kamakya, Mysuru Road, Nagarbhavi, Sumanahalli, Peenya, Hebbal
    Change to other lines at
    JP Nagar 4th Phase (Pink), JP Nagar and Peenya (Green), Mysuru Road (Purple), Sumanahalli (Grey), Hebbal and Kempapura (Blue, Red)

    Latest (11 Nov 2026): The government aims to complete tendering and begin work on the two Phase 3 lines within six months. Source

  • Grey Line (Phase 3)

    Hosahalli – Kadabagere, along Magadi Road

    Approved

    12.5 km · 9 elevated stations

    1. Awaiting approval
    2. Approved
    3. Construction
    4. Trials
    5. Open
    Where it stands
    Approved with the Orange Line in Aug 2024. Tenders to clear buildings along the route went out in 2026; the civil works tender has not been issued yet.
    What happens next
    Civil tender and start of work, aimed within six months (Minister Krishna Byre Gowda, Nov 2026).
    When trains could run
    Not announced.
    Areas it serves
    Magadi Road, from Hosahalli to Kadabagere
    Change to other lines at
    Hosahalli (Purple), Sumanahalli Cross (Orange)

    Latest (11 Nov 2026): Same six-month aim for tendering and starting work on both Phase 3 lines. Source

  • Red Line (Phase 3A)

    Sarjapur – Koramangala – Dairy Circle – KR Circle – Hebbal

    Awaiting approval

    About 37.8 km (revised plan) · 27–28 stations · about 14 km underground

    1. Awaiting approval
    2. Approved
    3. Construction
    4. Trials
    5. Open
    Where it stands
    Karnataka approved it on 6 Dec 2024 (36.59 km, 28 stations). It went to the Centre in Jan 2025, came back over cost, and a revised plan was sent in 2026. The Centre says it is “under appraisal”.
    What happens next
    Approval by the Union Cabinet. If cleared, the state hopes to tender it and start work by the end of 2027.
    When trains could run
    Not announced; the revised plan targets 2033.
    Areas it serves
    Sarjapur Road, Agara, Koramangala, Dairy Circle, the city centre, Hebbal
    Change to other lines at
    Agara and Ibbaluru (Blue), Dairy Circle (Pink), KR Circle (Purple), Hebbal (Blue, Orange)

    Latest (14 Nov 2026): The minister said the proposal has been waiting at the Centre for nearly 22 months. Source

Being studied, not approved: Madavara–Tumakuru, KR Puram–Hoskote, Challaghatta–Bidadi, Bommasandra–Attibele, Silk Institute–Harohalli and Kalena Agrahara–Kadugodi. Source (Sep 2026)

Checked 21 November 2026. Station counts and lengths are from project approvals and may change in the final design.

Bangalore metro map: questions

How many metro lines are there in Bangalore?+

Four Namma Metro lines carry passengers: Purple, Green, Yellow and the first section of the Pink Line, with 88 stations open. The Blue Line (Silk Board to the airport) is under construction.

Where can I download the Bangalore metro map?+

Choose Light or Dark under the map on this page, then tap Download PDF or Image (JPG). The light PDF prints well on A3 or A4 and shows every open and under-construction station.

What are the Namma Metro timings?+

From Tuesday to Saturday the first trains leave the end stations at 5 AM on the Purple and Green lines and 6 AM on the Yellow and Pink lines. On Sundays service starts at 7 AM. Monday trains start earlier. Last trains leave between about 10:40 PM and 11:55 PM.

Which are the interchange stations on Namma Metro?+

Majestic (Nadaprabhu Kempegowda) for the Purple and Green lines, RV Road for the Green and Yellow lines, and Jayadeva Hospital for the Yellow and Pink lines.

Does Namma Metro go to Bangalore airport?+

Not yet. The Blue Line (Central Silk Board to the airport via KR Puram and Hebbal) opens in parts: Silk Board to KR Puram around May 2027, Hebbal to the airport around September 2027, and KR Puram to Hebbal between December 2027 and March 2028, which completes the line. These are BMRCL targets, not official dates.

Is the Pink Line open?+

Yes, the first section opened on 14 November 2026: six elevated stations from Kalena Agrahara to SG Palya (formerly Tavarekere). The underground section towards MG Road and Nagawara is still being built.