Pink LineStations list, map and timings
Namma Metro's 18-station north–south line from Kalena Agrahara to Nagawara via MG Road. Phase 1, the six elevated stations from Kalena Agrahara to SG Palya on Bannerghatta Road, is inaugurated by Prime Minister Narendra Modi on 13 November 2026 and opens to the public from 14 November. The 12 underground stations, Dairy Circle to Nagawara, are expected around May 2027.
Phase 1: Kalena Agrahara to SG Palya, 6 stations
The elevated Bannerghatta Road section is running, with a train every 8 minutes.
- Fare: ₹10–30 between the six, ~₹60 to Majestic (expected)
- Trains: every ~6 min at peak, ~10 min off-peak
- Change: Yellow Line at Jayadeva Hospital
- Parking: two-wheelers only, at 4 stations
- Route
- Kalena Agrahara – SG Palya
- Stations
- 18 (6 open)
- First train (weekdays)
- 6:00 AM
- Last train
- 10:54 PM
- Trains every
- 8 min at peak
- Interchanges
- Jayadeva, MG Road, Nagawara
All 18 Pink Line stations, in order
All 18 stations, south to north, with when each one opens.
Pink Line map
Every Pink Line station on the city map, with interchanges marked and the other lines shown faded. Full Bangalore metro map

Tap the map to open it full size. Map data © OpenStreetMap contributors.
Pink Line timings
First and last train from each end of the line. Trains run every 8 minutes at weekday peak hours and every 10 minutes or so on Sundays.
| Day | From Kalena Agrahara | From SG Palya |
|---|---|---|
| Monday | 4:55 AMlast 10:50 PM | 5:00 AMlast 10:54 PM |
| Tuesday to Friday | 6:00 AMlast 10:50 PM | 6:00 AMlast 10:54 PM |
| Saturday | 6:00 AMlast 10:50 PM | 6:00 AMlast 10:54 PM |
| Sunday | 7:00 AMlast 10:50 PM | 7:00 AMlast 10:54 PM |
From BMRCL's timetable. Mondays start early; Sundays start at 7:00 AM. For your station's own first and last train, open it from the list above or see Namma Metro timings for every station.
Major Interchange Hubs
Strategic network junctions connecting multiple transit corridors.
About the Pink Line
Phase 1: inauguration 13 November, open to the public 14 November 2026
The first part of the Bengaluru Metro Pink Line opens to the public at 6 AM on 14 November 2026. Prime Minister Narendra Modi inaugurates it on 13 November and rides from SG Palya to Bilekahalli-IIMB (inauguration confirmed on 3 November by MP Tejasvi Surya, public opening on 11 November by Minister Krishna Byre Gowda; the Commissioner of Metro Railway Safety cleared the section on 28 October). With it, Namma Metro crosses 100 km: 103.6 km in all, the second largest metro network in India after Delhi.
Phase 1 is the elevated section on Bannerghatta Road, six stations:
- Kalena Agrahara (southern end)
- Hulimavu
- Bilekahalli-IIMB (formerly IIM Bangalore)
- NS Palya-JP Nagar 4th Phase
- Jayadeva Hospital (change here for the Yellow Line)
- SG Palya (northern end of Phase 1)
BMRCL starts with five trains, four in service and one on standby, running every 8 minutes at first; the gap may get shorter once the signalling settles. Expected fares are ₹10 to ₹30 between these six stations and about ₹60 to Majestic, with a 5% discount on a smart card or QR ticket. Two-wheeler parking is planned at four stations (Hulimavu, Bilekahalli-IIMB and SG Palya, 155 slots each, and Kalena Agrahara, 110). No car parking has been announced. Fares and first and last train times are expected values until BMRCL publishes them at launch. Check the fare and time from your station.
The underground section: around May 2027
The other 12 stations, from Dairy Circle to Nagawara, are underground. They do not open on 14 November. BMRCL now expects this section around May 2027 (the earlier target was December 2026):
- Dairy Circle
- Lakkasandra
- Langford Town
- National Military School
- MG Road (Purple Line interchange)
- Shivajinagar
- Cantonment (Bengaluru Cantonment railway station)
- Pottery Town
- Tannery Road
- Venkateshpura
- Kadugondanahalli (KG Halli)
- Nagawara (northern end, future Blue Line interchange)
Until then, people near these stations reach the Pink Line by changing to the Yellow Line and riding to Jayadeva Hospital.
Route and length
The Pink Line is Reach 6 of Namma Metro Phase 2, built by the Bangalore Metro Rail Corporation Limited (BMRCL). It runs about 21.25 km from Kalena Agrahara in south Bengaluru to Nagawara in the north, along Bannerghatta Road, through the city centre at MG Road and Shivajinagar, and on to the north-eastern suburbs. It has 18 stations: 6 elevated and 12 underground.
Interchanges
- Jayadeva Hospital: Yellow Line (RV Road to Bommasandra). Works from 14 November 2026.
- MG Road: Purple Line. Opens with the underground section, around May 2027.
- Cantonment: Bengaluru Cantonment railway station. Around May 2027.
- Nagawara: Blue Line to the airport. The Pink side opens around May 2027; the Blue Line's KR Puram–Hebbal stretch through Nagawara is expected between December 2027 and March 2028.
Why it matters
Bannerghatta Road has had no metro until now. Phase 1 gives Hulimavu, Arekere, Bilekahalli and JP Nagar a direct link to the Yellow Line at Jayadeva Hospital, and through it to Electronics City, RV Road and the rest of the network. Once the underground section opens, the Pink Line will run straight from Bannerghatta Road to MG Road, Shivajinagar and Nagawara without a change of train.
