Namma Metro · Bengaluru

Namma Metro lines

4 lines running, 88 stations open. Pick a line for its stations, map and timings.
  • Whitefield – Challaghatta · 37 stations

    Trains 5:00 AM – 11:05 PM, every 8 min at peak

    Change atKR PuramMG RoadMajestic
  • Madavara – Silk Institute · 32 stations

    Trains 5:00 AM – 11:05 PM, every 7 min at peak

    Change atMajesticRV Road
  • RV Road – Bommasandra · 16 stations

    Trains 6:00 AM – 11:55 PM, every 5.5 min at peak

    Change atSilk BoardJayadevaRV Road
  • Pink Line

    6 of 18 open

    Kalena Agrahara – Nagawara · 18 stations

    Trains 6:00 AM – 10:54 PM, every 8 min at peak

    Change atJP Nagar 4th PhaseJayadevaMG RoadNagawara
  • Blue Line

    Under construction

    Silk Board – KIAL Terminals · 29 stations

    Trial runs; Silk Board–KR Puram expected 2027, airport around 2028

    Change atSilk BoardKR PuramNagawara

Lines coming later

Where each new line stands today, what happens next, and when trains could run. Targets are reported, not official, unless BMRCL has announced a date.

  • Blue Line (airport line)

    Central Silk Board – KR Puram – Hebbal – Airport

    Trial runs

    58.19 km · 29 stations · Silk Board–KR Puram section 19.75 km, 13 stations

    1. Awaiting approval
    2. Approved
    3. Construction
    4. Trials
    5. Open
    Where it stands
    Test trains run from Byappanahalli depot to Doddanekundi on the Outer Ring Road (since 10 Nov 2026). Civil work was about 72% done in August; signalling is the main job left.
    What happens next
    Finish the last stretch of track and the signalling, then the safety inspection by the Commissioner of Metro Rail Safety (not yet scheduled).
    When trains could run
    In three parts (below). The whole line, Silk Board to the airport, around March 2028. BMRCL targets, not official dates.
    Opens in parts
    1. 1Central Silk Board – KR Puram (Outer Ring Road)Phase 2A · 19.75 km · 13 stationsAround May 2027Trial runs
    2. 2Hebbal – Yelahanka – AirportPhase 2B, part 1 · 8 stations, Hebbal to KIAL TerminalsAround Sep 2027Under construction
    3. 3KR Puram – Nagawara – HebbalPhase 2B, part 2 · 8 stations, Kasturi Nagar to Kempapura; joins the two partsDec 2027 – Mar 2028Under construction
    Areas it serves
    HSR Layout, Agara, Bellandur, Marathahalli, Doddanekundi, KR Puram, Hebbal, Yelahanka, the airport
    Change to other lines at
    Silk Board (Yellow), KR Puram (Purple), Nagawara (Pink, later), Hebbal (Orange and Red, later)

    Latest (10 Nov 2026): A test train reached Doddanekundi on the Outer Ring Road. Source

  • Pink Line underground

    Dairy Circle – MG Road – Shivajinagar – Nagawara

    Under construction

    13.76 km · 12 underground stations

    1. Awaiting approval
    2. Approved
    3. Construction
    4. Trials
    5. Open
    Where it stands
    The tunnels are built; platform screen doors and signalling are being installed and linked. The elevated first section, Kalena Agrahara–SG Palya, opened on 14 Nov 2026.
    What happens next
    Trial runs in the tunnels, then the safety inspection. No start of underground trials has been reported yet.
    When trains could run
    Around May 2027 (BMRCL target, not an official date).
    Areas it serves
    Lakkasandra, Langford Town, MG Road, Shivajinagar, Cantonment, Tannery Road, Nagawara
    Change to other lines at
    MG Road (Purple), Nagawara (Blue, later), Cantonment railway station

    Latest (19 Oct 2026): BMRCL aimed to start running trains as far as Shivajinagar by November 2026; the opening target is May 2027. Source

  • Orange Line (Phase 3)

    JP Nagar 4th Phase – Mysuru Road – Peenya – Hebbal – Kempapura

    Approved

    32.15 km · 21–22 elevated stations · parts double-decker with a road flyover

    1. Awaiting approval
    2. Approved
    3. Construction
    4. Trials
    5. Open
    Where it stands
    Approved by the Union Cabinet in Aug 2024 (with the Grey Line, ₹15,611 crore). A ₹6,100 crore JICA loan was signed in Mar 2026. Civil tenders were invited in Jan 2026, but no contract is awarded yet: the double-decker design still needs the Centre’s clearance.
    What happens next
    The state aims to finish tendering and start work within six months (Minister Krishna Byre Gowda, Nov 2026). That is when work starts, not when trains run.
    When trains could run
    Not announced. The 2024 approval said 2029; newer reports point to 2031–32.
    Areas it serves
    Western Outer Ring Road: JP Nagar, Kamakya, Mysuru Road, Nagarbhavi, Sumanahalli, Peenya, Hebbal
    Change to other lines at
    JP Nagar 4th Phase (Pink), JP Nagar and Peenya (Green), Mysuru Road (Purple), Sumanahalli (Grey), Hebbal and Kempapura (Blue, Red)

    Latest (11 Nov 2026): The government aims to complete tendering and begin work on the two Phase 3 lines within six months. Source

  • Grey Line (Phase 3)

    Hosahalli – Kadabagere, along Magadi Road

    Approved

    12.5 km · 9 elevated stations

    1. Awaiting approval
    2. Approved
    3. Construction
    4. Trials
    5. Open
    Where it stands
    Approved with the Orange Line in Aug 2024. Tenders to clear buildings along the route went out in 2026; the civil works tender has not been issued yet.
    What happens next
    Civil tender and start of work, aimed within six months (Minister Krishna Byre Gowda, Nov 2026).
    When trains could run
    Not announced.
    Areas it serves
    Magadi Road, from Hosahalli to Kadabagere
    Change to other lines at
    Hosahalli (Purple), Sumanahalli Cross (Orange)

    Latest (11 Nov 2026): Same six-month aim for tendering and starting work on both Phase 3 lines. Source

  • Red Line (Phase 3A)

    Sarjapur – Koramangala – Dairy Circle – KR Circle – Hebbal

    Awaiting approval

    About 37.8 km (revised plan) · 27–28 stations · about 14 km underground

    1. Awaiting approval
    2. Approved
    3. Construction
    4. Trials
    5. Open
    Where it stands
    Karnataka approved it on 6 Dec 2024 (36.59 km, 28 stations). It went to the Centre in Jan 2025, came back over cost, and a revised plan was sent in 2026. The Centre says it is “under appraisal”.
    What happens next
    Approval by the Union Cabinet. If cleared, the state hopes to tender it and start work by the end of 2027.
    When trains could run
    Not announced; the revised plan targets 2033.
    Areas it serves
    Sarjapur Road, Agara, Koramangala, Dairy Circle, the city centre, Hebbal
    Change to other lines at
    Agara and Ibbaluru (Blue), Dairy Circle (Pink), KR Circle (Purple), Hebbal (Blue, Orange)

    Latest (14 Nov 2026): The minister said the proposal has been waiting at the Centre for nearly 22 months. Source

Being studied, not approved: Madavara–Tumakuru, KR Puram–Hoskote, Challaghatta–Bidadi, Bommasandra–Attibele, Silk Institute–Harohalli and Kalena Agrahara–Kadugodi. Source (Sep 2026)

Checked 21 November 2026. Station counts and lengths are from project approvals and may change in the final design.

Full metro mapTimings at every stationFare calculator