Krishnarajapura Metro Station
ಕೃಷ್ಣರಾಜಪುರ (ಕೆ.ಆರ್.ಪುರ)
Krishnarajapura is a Namma Metro station on the Purple Line between Singayyanapalya and Benniganahalli. The first train is at 5:24 AM and the last at 12:00 AM (Tuesday to Saturday); on Sundays service starts at 7:24 AM. Majestic is 11 stops away, about 24 minutes and ₹60.
Krishnarajapura Metro Station TimingsNext trains
Line
- Platform 1 towards Whitefield · next Singayyanapalya
- Platform 2 towards Challaghatta · next Benniganahalli
First and last train
Exit gates
Parking
Nearby
Krishnarajapura Metro Station Directory: Entry & Exit Gates
2 gates and the side each one opens towards
- A
KR Pura Railway Station side
- B
Whitefield Main Road side
Station Facilities
Only facilities we have confirmed are listed. Others may also be available.
Places near Krishnarajapura Metro Station
Lowry Adventist College And Group Of Institutions
College · about 2 min walk
Lowry Memorial College
College · about 7 min walk
Pragathi Piles Hospital
Hospital · about 12 min walk
ITI General Hospital
Hospital · about 12 min walk
Krishnarajapuram railway station
Railway station · about 4 min walk
B Narayanapura Park
Park · about 7 min walk
Krishnarajapura Metro Station first and last train
Purple Line trains at Krishnarajapura leave from Platform 1 towards Whitefield and Platform 2 towards Challaghatta. Trains start earliest on Mondays and latest on Sundays. The table below gives the first and last train in each direction for every day of the week, worked out from BMRCL’s published timetable, and the live timer at the top of this page shows the next departures. BMRCL can change train times for planned maintenance or special events.
| Direction | Monday | Tue – Fri | Saturday | Sunday |
|---|---|---|---|---|
Towards Whitefield Purple Line · next stop Singayyanapalya | First 5:10 AM Last 12:00 AM | First 5:55 AM Last 12:00 AM | First 5:55 AM Last 12:00 AM | First 7:55 AM Last 12:00 AM |
Towards Challaghatta Purple Line · next stop Benniganahalli | First 4:39 AM Last 11:09 PM | First 5:24 AM Last 11:09 PM | First 5:24 AM Last 11:09 PM | First 7:24 AM Last 11:09 PM |
Calculated from the official BMRCL timetable; times at intermediate stations are approximate (±2 min) and can change for planned works.
Krishnarajapura Metro Station Map & Route Map
Location
Krishnarajapura Metro Station, Bengaluru
NH 44, Chinappa Colony, Mahadevapura, Bengaluru, Karnataka 560016
The station has two platforms. Platform 1 serves trains towards Whitefield; Platform 2 serves trains towards Challaghatta. The Purple Line interchanges with the Green Line at Nadaprabhu Kempegowda (Majestic), from where you can reach Jayanagar, Silk Institute and Madavara, and connect onward to the Yellow Line at Rashtreeya Vidyalaya Road for Electronic City. Mahatma Gandhi Road is the planned interchange with the Pink Line.
Frequently Asked Questions
Stations on the same lines
View allAbout Krishnarajapura
Krishnarajapura Metro Station — Purple Line, Namma Metro
Krishnarajapura Metro Station is an elevated station on the Purple Line of Namma Metro in Bengaluru, at KR Puram. The Purple Line is the network’s east-west corridor, running 43.49 km from Whitefield in the north-east to Challaghatta in the south-west across 37 stations. It is the oldest line on the network: its first section opened on 20 October 2011. Krishnarajapura Metro Station opened on 2023-03-26.
The station is serving KR Puram, one of the busiest road junctions in east Bengaluru, and close to Krishnarajapuram railway station.
Blue Line at KR Puram (under construction)
KR Puram will be the meeting point of the Purple Line and the Blue Line, Namma Metro’s Outer Ring Road and airport line. The Blue Line station is being built next to the existing Purple Line station, by KR Puram railway station. From here the Blue Line runs south-west along the ORR through Mahadevapura, Marathahalli and Bellandur to Central Silk Board (Phase 2A, 13 stations, expected in 2027), and north through Kasturi Nagar, Nagawara and Hebbal to the airport (Phase 2B, expected around 2028). Neither has an official opening date.
Test trains have run from Baiyappanahalli depot towards KR Puram since November 2026. Once the line opens, KR Puram to Central Silk Board is 12 stops, about 30 minutes by our estimate, against 60 to 85 minutes by car at 9 AM. Next Blue Line stations: Saraswathi Nagara towards Silk Board and Kasturi Nagar towards the airport. See all 29 on the Blue Line page.
